What does our process involve?
In a custom built design the client/contractor would provide Perfect Panel Systems Ltd. with a final signed set of building plans with window rough openings and floor joist and roof system drawings. Perfect Panel Systems Ltd. would then create shop drawings and get engineering approval prior to production. This process generally takes 2 weeks. Once all the approvals have been obtained, the client/contractor must approve the shop drawings.
Prior to the start of production Perfect Panel Systems Ltd will evaluate work load and proceed with manufacturing in a timely fashion. This process will not hinder site work.
The client/contractor at this point would commence with building the foundation and infrastructure work. Perfect Panel Systems Ltd will allow the client/contractor to concurrently move forward with multiple construction activities.
Perfect Panel Systems Ltd will coordinate the construction with our manufacturing facility. As the panels are completed they are shipped to the job site for assembly. The entire process takes Perfect Panel Systems 2 weeks or less from conception to construction.